For RATING SHIRTS - Click on your Rating Abbreviation below:
AB AC AD AE AG AK AM AO AQ AS AT AW AX AZ BM BT BU
CE CM CS CT DC DK DM DP DS DT EA EM EN EO ET EW
FC FT GM GS (53-61) GS (78-Now) HM HT IC IM IS IT JO LI LN LS
MA (48-67) MA (72-Now) ME ML MM MN MR MS MT MU NAVY NC ND OM OS OT
PC PH PM PN PR QM RD (WW2) RD (48-72) RM SD SF SH SK SM
SO ST SV SW TM UT WT YN NAVY DIVER


U.S.S. ALBANY

(CA-123)

SHOW BOAT

Click to view crew list
 

USS ALBANY (CA-123) - an Oregon City-class heavy cruiser

In Commission 1946 to 1980

CA-123 Deployments - Major Events

Add a CA-123 Shellback Initiation Add a CA-123 Deployment - Major Event
Month Year to Month Year Deployment / Event
MAR1944-Keel Date: 6 MAR 1944
JUN1945-Launch Date: 30 JUN 1945
JUN1946-Commissioned: 15 JUN 1946
FEB1947-Shellback Initiation - 2 FEB 1947 - Atlantic Ocean
JAN1951-FEB1951Deployment to Brazil
JAN1951-Shellback Initiation - 25 JAN 1951 - Atlantic Ocean
JUN1953-Shellback Initiation - 19 JUN 1953 - Atlantic Ocean
JAN1954-AUG1955Mediterranean-Lebanon
JUN1957-Shellback Initiation - 27 JUN 1957 - Atlantic Ocean
JUN1957-Shellback Initiation - 27 JUN 1957 - Pacific Ocean
JUN1957-AUG1957South America
JUN1957- Shellback Initiation - 26 JUN 1957 - Atlantic Ocean
SEP1957-FEB1958Mediterranean
SEP1957-OCT1957North Pole
AUG1980-Decommissioned: 29 AUG 1980

CA-123 General Specifications

Complement: 1 969 officers and enlisted

Displacement: 13700 tons

Length: 673 feet 5 inches

Beam: 70 feet 10 inches

Draft: 26 feet 4 in

Flank Speed: 32 Knots



USS ALBANY (CA-123)



The fourth Albany (CA-123) was laid down on 6 March 1944 at Quincy, Mass., by the Bethlehem Steel Co.; launched on 30 June 1945; sponsored by Mrs. Elizabeth F. Pinckney; and commissioned on 15 June 1946 at the Boston Navy Yard, Capt. Harold A. Carlisle in command.

Following outfitting and a shakedown cruise in the vicinity of Casco Bay, Maine, Albany began operations along the east coast of the United States punctuated with cruises to the West Indies. During the ensuing months, the cruiser made a number of voyages for the purpose of training naval reservists and NROTC midshipmen. Albany continued to perform such duty until 11 September 1948 when she stood out of Chesapeake Bay for her first tour of duty with the American naval forces operating in the Mediterranean Sea, recently made a permanent establishment as the 6th Fleet. That deployment set the tone for the next decade. The cruiser alternated five assignments to the 6th Fleet with operations along the east coast of the United States and in the West Indies and made three cruises to South American ports. During one of the South American voyages, Albany carried the official United States representative to the inauguration of the President of Brazil in January 1951.

On 30 June 1958, Albany was placed out of commission at the Boston Naval Shipyard to begin conversion to a guided missile cruiser. On 1 November 1958, she was redesignated CG-10. The warship spent the next four years at Boston undergoing very extensive modifications as part of the conversion. The ship was recommissioned at Boston on 3 November 1962, Capt. Ben B. Pickett in command. For almost five years, she again alternated deployments to European waters-both to the Mediterranean Sea and to the North Atlantic-with operations along the east coast and in the West Indies. During that time, the cruiser visited many foreign ports and participated in a number of exercises with units of friendly navies. On 1 March 1967, she was decommissioned at the Boston Naval Shipyard once again to undergo extensive modifications. Some 20 months later, on 9 November 1968, the guided missile cruiser was placed back in commission at Boston, Capt. Robert C. Peniston in command.

However, the warship did not complete her rehabilitation and modernization overhaul until the summer of 1969. On 5 July, she stood out of Boston on her way-via Yorktown, Va., and Norfolk, Va.-to Mayport, Fla., her new home port. After several weeks of preparations, Albany embarked upon her shakedown cruise to the West Indies on 15 September. On 31 October, the guided missile cruiser returned to Mayport to begin operations with the Atlantic Fleet. Late in February 1970, Albany embarked upon her first deployment to European waters since her modernization overhaul. During the next six years, she made three cruises to the Mediterranean and completed one assignment to northern European waters. On 10 August 1976, Albany put to sea from Norfolk, bound for an extended tour of duty with the 6th Fleet in the Mediterranean Sea. Operating from her overseas home port at Gaeta, Italy, she served as flagship for the Commander, 6th Fleet, for almost four years.

Relieved of that duty at Gaeta by Puget Sound (AD-38) on 28 May 1980, the guided missile cruiser embarked upon the voyage back to the United States on 2 June. After stops at Mallorca, Spain, and Lisbon, Portugal, she arrived in New York City on 20 June. From there, the warship moved south to Hampton Roads, Va. On 29 August 1980, Albany was placed out of commission at Norfolk, Va. She was berthed with the Norfolk Group, Atlantic Reserve Fleet. Her name was struck from the Navy list on 30 June 1985. However, as of the beginning of 1987, the ship was still there.

[Note: The above USS ALBANY (CA-123) history may, or may not, contain text provided by crew members of the USS ALBANY (CA-123), or by other non-crew members, and text from the Dictionary of American Naval Fighting Ships]